FAQ & Releted Reading

Home Article FAQ & Releted Reading

For different floors, what are the paving requirements for PVC flooring?

For different floors, what are the paving requirements for PVC flooring?

Jul 22, 2024

PVC flooring is a paving more convenient floor decoration materials, that is, paving that is used for different floors, PVC flooring paving requirements are not the same.

 

General requirements.

 

In order to pave successfully, please be sure to carefully check your current stage of the ground, to ensure that all the ground must be neat, smooth, hard, dry and no gaps.

 

Specifics for different floors:

 

Cement floor: make sure it is neat and not wet and cold (if the floor is painted, remove all the paint), and repair all the gaps and rotten holes first.

 

Wooden floor: to ensure that the original wooden floor neat, clean, no color glaze, no wax, diaphragm vacuum pump, and solid adhesion on the ground, all the gaps with the right amount of filler to make up for the flat.

 

Stone plastic plate PVC floor: remove all the dirty machine oil or polishing waxed wood floor, try not to lay on the soft plastic or rubber flooring, this kind of wood flooring must be removed or add plywood.

 

All interior decoration work (including paint) is not completed when not construction laying PVC flooring, unless it is covered maintenance, in order to avoid PVC flooring by environmental pollution or destruction.

 

PVC floor can not be subjected to rain, not direct sunlight, should be placed in a flat indoor temperature of 20 above the site.

 

Newly paved concrete floor, must wait until completely dry before construction, generally must be more than 30 days, such as natural ventilation excellent occasions, but also at least 3 weeks.

 

Note: PVC flooring construction should be surveyed before the ground, the general moisture content of 40% of the following can be constructed, 40% -60% of the place, it is appropriate to first test pavement, a small area to determine the construction, the moisture content of more than 60% can not be constructed.

 

Before construction, the ground must be completely cleaned and tidy, if there is unevenness or other bad place, should be ground or scraped, the ground is more serious sand, should be painted again.

 

In accordance with the standard sketching line of the house building, find out the positioning point, and then use a ruler to measure 90 ° to find out the vertical bisecting line, and then use the bucket line to pop out the datum line.

 

Wipe the floor glue board should follow the datum line positioning point for the starting point, to the four sides of the datum line gradually to the toothed line steel scraper knife (teeth mouth to be dense and shallow) wipe the water-based glue, about 20-30 minutes to lay the PVC flooring, wipe the total area of the ratio of about one hour can be affixed to the appropriate, wipe to be sure to be well proportioned, and the water-based glue belongs to the semi-sensory pressure of the glue, paste only must be in the PVC flooring on the pressure. It can be.

 

Water-based adhesive wipe, to be slightly evaporated water (about 20 minutes), to lightly press the hand does not stain the hand as a standard, that is, gradually from the positioning point along the baseline one by one laying PVC flooring, laying PVC flooring to solve the Qi, from the top to the bottom of the placement, and in a piece of PVC flooring around the squeeze, so that a piece of the ground and the ground in line with.

 

Water-based glue from the interface extrusion molding overflow, please immediately use a wet rag will stick to the wood floor on the glue wash, if you can not immediately wash, wait for drying will be more difficult to solve, please pay special attention. (If the natural environment allows the use of automotive gasoline or paint thinner cleaning)

 

Around the edge of the end, another piece of PVC flooring placed on the edge of the paved PVC flooring, so that the two pieces of PVC flooring edges thoroughly affixed, and then take another piece of PVC flooring as a gauge, one side of the wall, diagonal with a paper cutter along the edges of the laser cutting, and will be paved on the wall of the ground at the.

 

Around the edge of the construction, must be completely cleaned up the laser cutting debris, and then extrusion molding along the shore with a roller drum, so that does not fit the edge of the PVC flooring in line with the leveling, and then wash with a wet rag, there is a sticky stain, please use a small amount of adhesive removal liquid carefully eliminated, and then scrubbed neatly with cold water.

 

Laying is completed, first remove all the dirt, and then waxing maintenance of the surface layer, in order to keep the PVC floor beautiful and durable.

 

Daily cleanup, cold water mopping to remove can be, in order to better maintain the maintenance of PVC floor surface bright, can be polished and waxed on time, can keep the PVC floor beautiful as new for a long time.

WUXI TEFA DECORATION MATERIAL CO., LTD.

Add : No.5 Huaqing Intelligent Park, Huishan District, Wuxi, Jiangsu, China

Tel : +86 18751567592

Email : web@topvcfloor.com

Subscribe

Please read on, stay posted, subscribe, and we welcome you to tell us what you think.

Submit
Facebook Youtube Linkedin Pinterest Twitter

Copyright © 2024 WUXI TEFA DECORATION MATERIAL CO., LTD. All Rights Reserved. Sitemap | Blog | Xml | Privacy Policy Network Supported

Home

Products

contact

About