Projects

Home Projects

1200 square metres of medical homogeneous flooring October 2024 Hong Kong Hospital

1200 square metres of medical homogeneous flooring October 2024 Hong Kong Hospital

Feb 21, 2025

 

 

Project 

 Hong Kong Hospital

Type 

 Hospital offece and reception Hall

Area 

 1000+ square metres

Construction time 

 14 October to 18 October 2024

Acceptance 

 20 October 2024

Acceptance criteria 

 Anti-slip grade: R9

 Wear-resistant grade: T

 Fire rating: B1

Material Usage 

 1200+ square metres of PVC homogeneous flooring

Satisfaction 

 ✭✭✭✭✭

 

A general hospital in Hong Kong plans to expand its departments and refurbish its existing flooring, requiring flooring materials with properties such as anti-bacterial, non-slip, wear-resistant and easy-to-clean in order to meet the high standards of the medical environment. After many comparisons, the hospital finally chose medical vinyl homogeneous flooring as the flooring material.

 

Material Selection

 

Farfly chose a homogeneous floor covering from the Boniro range. This homogeneous floor covering has a UV finish. In addition to being extremely matte and scratch-resistant, the flooring is resistant to most chemicals, plus Farfly added iodine resistance to the flooring.Farfly chose the beige and light grey ranges to enhance the bright atmosphere of the building. The advantages of this vinyl flooring, in addition to its pressure-resistant qualities, are its pleasant walking sound and soft touch.

  

Notes on construction

When the floor arrived at the project site, the workers unfolded the floor and laid it flat for 2 days. Let the floor fully adapt to the ambient temperature.

Clean the original floor to ensure no dust and oil.

Repair cracks and unevenness, sand the floor to ensure that the flatness meets the requirements (no more than 2mm error within 2 metres).

Use cement self-levelling material to level the ground, make sure the surface is smooth and even.

Use environmentally friendly glue to evenly coat the ground, lay the floor in order, compact it with a roller to ensure that there are no air bubbles.

Use heat welding process to deal with the joints to ensure seamless connection.

Clean the floor after construction, remove residual glue and dust.

Thoroughly disinfect and wax before delivery to ensure compliance with hospital hygiene standards.

Through the scientific construction process and strict quality control, Farfly's homogeneous flooring was successfully applied to the hospital, meeting the high requirements of the medical environment, improving the overall environmental quality and gaining high recognition from the hospital.

 

 

Amount of auxiliary materials

 

 ● Soldering wire: 7  rolls

 ● Glue: 15 barrels

 ● Slotter*1  

 ● Welding gun* 1  

 ● Levelling knife* 2  

 ● Scraper* 2 

 ● Dolphin knife* 2

 ● Steel ruler* 2

 ● Roller* 1

 

 

The project was fully completed on 18 October 2024.

 

WUXI TEFA DECORATION MATERIAL CO., LTD.

Add : No.5 Huaqing Intelligent Park, Huishan District, Wuxi, Jiangsu, China

Tel : +86 18751567592

Email : web@topvcfloor.com

Subscribe

Please read on, stay posted, subscribe, and we welcome you to tell us what you think.

Submit
Facebook Youtube Linkedin Pinterest Twitter

Copyright © 2025 WUXI TEFA DECORATION MATERIAL CO., LTD. All Rights Reserved. Sitemap | Blog | Xml | Privacy Policy Network Supported

Home

Products

contact

About