Projects

Home Projects

100000sqm medical flooring May 2022 for Traditional Chinese Medicine

100000sqm medical flooring May 2022 for Traditional Chinese Medicine

Sep 10, 2023

  

 

Project   Dianjiang Hospital of Traditional Chinese Medicine
Type   Hospital
Area   123,000 square metres
Construction time   2022
Acceptance 
 15 April-30 May 2022
Acceptance criteria 
 Wear-resiststant grade:P  Fire rating:B1
Material Usage 
 100000+ square metres of homogeneous flooring
Satisfaction 
 ✭✭✭✭✭

 

Project introduction

 

The building area is 123,000 square metres. The establishment of beds 800, open beds 1050. It is a national Grade 3A Chinese medicine hospital integrating centralised medical treatment, teaching and research, preventive health care and Chinese medicine recuperation.

    Farfly a specialist in the healthcare sector has been appointed to equip the hospital with various vinyl floor coverings dedicated to entrances, corridors, bedrooms and technical or emergency areas (operating theatres, intensive care units...).

 

  In total 107500 sqm of floorcoverings were delivered for this huge project.

 

Project requirement

 

Due to hospital expansion. As a result, the hospital's new medical centre required a flooring solution that would be durable enough to withstand high levels of patient traffic for years to come, blend in with a calm, neutral aesthetic, and be both environmentally friendly and easy to clean and maintain.

 

Product recommendations and installation precautions

 

The Farfly's 'Boned' range quickly became the perfect flooring solution for the new medical centre.

 

  When installing a homogeneous floor, Farfly's professional construction team take many things into consideration.

  They ensure that the original flooring is clean, dry, level and free from any debris or contaminants that could affect adhesion.

 

   

  When Farfly's Boned Homogeneous Flooring arrived on site, the team laid the flooring flat on the floor to allow it to fully adapt to the environment in which it would be installed. This helps to prevent expansion or contraction after installation, which can take up to 48 hours.

 

  When choosing an adhesive, we chose a special adhesive for homogeneous floors. Allow time for the moisture in the adhesive to evaporate before installation.

 

  Environmental factors such as temperature and humidity are taken into account during installation. Extreme changes in these conditions can affect the performance of the adhesive and the flooring material itself.

 

  

The client was very pleased when the work was completed. Many thanks to Farfly for providing the flooring solution.

 

Amount of auxiliary materials

 

 Soldering wire: 700 rolls

 Glue: 1420 barrels

 Slotter*5pcs

 Welding gun*5pcs

 Levelling knife*20pcs.

 Scraper*5

 Dolphin knife*20

 Steel ruler*15

 Roller*5

 

 

 

 

WUXI TEFA DECORATION MATERIAL CO., LTD.

Add : No.5 Huaqing Intelligent Park, Huishan District, Wuxi, Jiangsu, China

Tel : +86 18751567592

Email : web@topvcfloor.com

Subscribe

Please read on, stay posted, subscribe, and we welcome you to tell us what you think.

Submit
Facebook Youtube Linkedin Pinterest Twitter

Copyright © 2025 WUXI TEFA DECORATION MATERIAL CO., LTD. All Rights Reserved. Sitemap | Blog | Xml | Privacy Policy Network Supported

Home

Products

contact

About