1000 square metres of medical homogeneous flooring August 2024 Macau Eye Clinic

1000 square metres of medical homogeneous flooring August 2024 Macau Eye Clinic

Jan 16, 2025

 

Project 

 Macau Eye Clinic

Type 

 Hospital Office and Reception Hall

Project area 

 1000+ square metres

Construction time 

 20 August to 23 August  2024

Acceptance 

 25 August  2024

Acceptance criteria 

 Anti-slip grade: R9

 Wear-resistant grade: T

 Fire rating: B1

Material Usage 

 1000+ square metres of PVC homogeneous flooring

Satisfaction 

 ✭✭✭✭✭

 

Project introduction

In 2024, a Macau eye clinic partnered with Farfly, which provided the sturdy, low-maintenance flooring needed for the project.

We find it very important to make our patients feel comfortable during treatment. Getting treatment is hard enough on its own. It's even better when it's easy to find your way around a healthcare building and still feel a sense of privacy. In a professional environment, patients immediately feel they are well taken care of.

 

 

 Product recommendations and installation precautions

Farfly chose homogeneous floor coverings from the Bonaire Collection. This homogeneous floor covering has a UV finish. In addition to being extremely matte and scratch-resistant, the flooring is resistant to most chemicals.Farfly's lighter colours were used the most to enhance the bright atmosphere of the building. Other colours indicate transitions to other areas. In this project, light and dark grey were ultimately used. The advantages of this vinyl flooring, in addition to its robust qualities, are its pleasant walking sound and soft touch.

 

This environmentally friendly medical homogeneous vinyl flooring is formaldehyde-free, hard-wearing, waterproof and stain-resistant, and with TVOC emissions of less than 20 μg/m3 after 28 days, it ensures good indoor air quality.

 

The installation was carried out in such a way as to blend in with the rest of the décor and to ensure that the flooring did not interfere with opening and closing doors, and that the corners were tightly fitted.

 

 

 

It was summer when the floor was installed, so we laid the floor flat for 2 days to allow the floor to fully adapt to the ambient temperature. This allowed the floor to fully acclimatise to the ambient temperature.

When applying the glue, pay attention to the humidity of the air and the temperature of the room, it takes longer to wait for the glue to reach its optimum condition.

 

This project was fully completed on 23rd August 2024.

 

Amount of auxiliary materials

 

 ● Soldering wire: 7  rolls

 ● Glue: 15 barrels

 ● Slotter*1  

 ● Welding gun* 1  

 ● Levelling knife* 2  

 ● Scraper* 2 

 ● Dolphin knife* 2

 ● Steel ruler* 2

 ● Roller* 1

WUXI TEFA DECORATION MATERIAL CO., LTD.

Add : No.5 Huaqing Intelligent Park, Huishan District, Wuxi, Jiangsu, China

Tel : +86 18751567592

Email : web@topvcfloor.com

Subscribe

Please read on, stay posted, subscribe, and we welcome you to tell us what you think.

Submit
Facebook Youtube Linkedin Pinterest Twitter

Copyright © 2025 WUXI TEFA DECORATION MATERIAL CO., LTD. All Rights Reserved. Sitemap | Blog | Xml | Privacy Policy Network Supported

Home

Products

contact

About